Good news
juwi and Windwärts join forces.
Please check www.juwi.energy for all information and a first impression of our new brand appearance.
> watch nowDo not show this message again.
Solar
The 12.93 MW (DC) L&D Landfill Solar project achieved commercial operation in December 2015. The project is located in Mt. Holly, New Jersey, and was constructed by JSI Construction Group; the Engineering, Procurement, and Construction (EPC) contractor. The L&D Landfill is built on an existing Waste Management owned landfill that decommissioned in the 1980’s. Construction included the use of pour-in-place ballasts, fixed tilt racking, and thousands of PV panels. Public Service Electric & Gas (PSE&G) will own and operate the facility, which generates enough power for approximately 2,000 average size homes in New Jersey.
Good news
Please check www.juwi.energy for all information and a first impression of our new brand appearance.
> watch now