Solar

Bison Solar

Capacity:
30 MW
Annual Yield:
61 mil. kWh
Country:
United States
State:
Colorado
Commissioning:
2016
Modules:
117120

The 30 Megawatt (MW) Bison Solar Project achieved substantial completion in October 2016. The Project is located in north Wellington, Colorado, and was constructed by JSI Construction Group, the Engineering, Procurement, and Construction (EPC) Contractor. The Bison Solar facility is built adjacent to the Platte River Power Authority – Rawhide Energy Station; a 200 plus MW coal facility. Bison Solar LLC owns the facility and will be operated by the JSI O&M Group. The Bison Solar Project includes more than 117,000 panels, and generate power for approximately 5,000 average size residential homes in Colorado.

  • Construction Began in February 2016
  • Commercial operation was achieved in October 2016
  • Includes 117,120 modules constructed on the juwi (JES) single axis tracker
  • Project Owner: Bison Solar LLC (PSEG Solar Source)
  • Annual generation (avg) 61,000 MWh

More topics

Contact:

Felix Wächter, Pressesprecher der juwi-Gruppe

Felix Wächter
Press Officer

Call back E-Mail


Newest article

Largest single project in the history of the joint venture: juwi Shizen Energy connects 54-megawatt solar park to the grid in Japan

The solar power plant is located on a former golf course about 100 kilometers north of Tokyo. more

juwi Operations & Maintenance GmbH expands range of services to include maintenance for large-scale battery storage systems

Service offering for large-scale battery storage systems includes maintenance, repair and… more

juwi commissions largest bi-facial solar power plant of Europe

In the Greek city of Kozani, juwi made an important contribution to the transformation of energy… more