New construction principle for wind energy plants

They are angular, colored and somehow really different: The new turbines near Schornsheim (South-West Germany) do not only present a visual innovation. Learn more about the new construction principle of "Advanced Tower Systems (ATS)" and its advantages here.

The new segments...
...are long and slender.
Bit by bit...
...the new tower is constructed.

The ATS-tower consists of 15 meters long, slender segments and of corner elements. In contrast to tower segments from other manufacturers, they fit perfectly into ordinary trucks and do not have to be transported as wide loads. The segments can thus be transported conventionally, which shortens construction time.

 

The ATS tower's particular design in Schornsheim is based on the idea that we can adjust the turbines' color to their environment. With these projects, we can offer the local municipality or even the public the option to select the colors they want for the lower third of the towers. They could, for example, choose the colors that represent their community.

 

Facts about the ATS/Kenersys-plants in Schornsheim:

  • power house and rotor blades Type Kenersys K100
  • capacity per turbine 2,5 Megawatts
  • hub height 135 meters
  • output about 24 million kWh per year
  • the wind farm will provide clean power for 8,000 households

 

Further information on Advanced Tower Systems:

Advanced Tower Systems


Further information on Kenersys: 

Kenersys 
 

Award for ATS

ATS was awarded for being a very innovative project in Germany.

juwi Wind GmbH

Energie-Allee 1

55286 Wörrstadt

 

E-Mail

Tel.+49. (0)6732. 9657- 0

Fax.+49. (0)6732. 9657- 7001

 

Other Contact Persons

Your Partner from A-Z

From planning to repowering - we are your competent partner for sophisticated wind energy projects.

 

Further Information

References

Since 1996 juwi has constructed more than 500 wind turbines with more than 850 MW.

 

Further Information